Massive construction
Naturofloor is applied seamlessly as a levelling compound directly onto subsequent substrates and enables endless design possibilities.
Cement screed: approx. 30 days old / maximum residual moisture 2.5 % (CM)
Cement and cement plaster with added lime: dry, crack- and dust-free
Anhydrite and flowing screed (calcium sulphate): approx. 5-6 weeks old/ residual moisture 0.5 % (CM), sintered skin must be completely removed and sanded within the specified period.
Ceramic slabs / tiles, free of cracks and cavities.